| |
|
Senior
production manager with broad experience in fast-paced, high-tech environments
requiring expertise in production scheduling, quality management, team
building, training, cost control, and troubleshooting. |
 |
Highly effective in utilizing resources, improving processes, and
reducing costs.
|
 |
Computer literate. Experienced with Excel, Word, Access and MAPICS
(MRP mainframe programs).
|
 |
Thoroughly familiar with a broad range of manufacturing protocols and lean methodology. |
 |
College graduate with degree in Business Administration.
|

Senior
Production Supervisor
Advo Technology, Beaverton, Oregon (2009-Present)
Lead and supervise production operations for Advo's North American LCD
repair facility. Coordinate special short-term projects.

 |
Designed hybrid methodology that
increased productivity 32%.
|
 |
Increased units per person/per day (UPPD) from 3.4 to 11.3.
|
 |
Restructured warehouse and work order release system to conform to
MRP demand schedule.
|

Production Supervisor
ABC Computer, San Antonio, Texas (2007-2009)
Managed production operations in the printed circuit board assembly area.
Hired, trained, and developed a highly productive work force.

 |
Developed and administered programs that reduced PC assembly defect
rate from 46K DPM to 730 DPM during the first month.
|
 |
Set in-house records for quality and productivity in the PCBA and
PC manufacturing areas.
|
 |
Exceeded quality and productivity goals in PC Final Assembly within
six weeks.
|

Hardware Operations Manager / Configuration Manager
XYZ Computer Language Center, New York, New York (2002-2007)
Coordinated startup of state-of-the-art BTO / CTO systems integration
facility. Set up Configuration Lab and specified/purchased equipment.

 |
Instituted quality program that maintained an out-of-box failure rate
for all products of 1%.
|
 |
Developed and implemented policies, procedures, and processes to streamline
manufacturing operations.
|
 |
Received two "Team Player" awards.
|

Production Supervisor
ABC Electronics Division, Old Bridge, New Jersey (1999-2002)
Supervised the production of optical devices and directed
a production crew of 27.

 |
Reduced line HPU (hours per unit) from 18.0 to 10.0.
|
 |
Cut rework costs 60% within nine months.
|

Supervisor
Zenia Electronics Inc., Portland, Oregon (1997-1999)
Supervised work crews in the chemical operations area. Oversaw chemical
processing and shipping/receiving. 
B.S.
Business Administration (1996)
Portland State University, Portland, Oregon
|